Data Center Directory

Amazon Web Services

Amazon Web Services is an operational data center operated by Amazon Web Services in New Albany, United States. Our footprint estimate of its power is about 23 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power23 MW (range 12 MW to 37 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 19,444 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 9,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.09217, -82.72755

Power and grid

Nearest high-voltage substationInnovation Substation, 138 kV, 300 m away (American Electric Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJug Street Substation, 345 kV, 1.8 km away
HV substations within 10 km23
UtilityLicking Rural Electric INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 4.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days532 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon Web Services use?

We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.

What chips does Amazon Web Services use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon Web Services to the power grid?

The nearest high-voltage substation in OpenStreetMap is Innovation Substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.

How clean is the power for Amazon Web Services?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates Amazon Web Services?

Amazon Web Services.

Data centers near New Albany

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.