TJX Corporate Techno is an operational data center in New Albany, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
Facility power11 MW (range 5.5 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,192 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCompugen New Albany
AddressNew Albany Road East 6595, 43054, New Albany
Coordinates40.10389, -82.81061

Power and grid

Nearest high-voltage substationCorridor Substation, 345 kV, 3.7 km away (AEP Ohio)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km27
UtilityOhio Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 600 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km9 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TJX Corporate Techno use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is TJX Corporate Techno to the power grid?

The nearest high-voltage substation in OpenStreetMap is Corridor Substation (345 kV), about 3.7 km away. The local utility is Ohio Edison Co, in the PJM balancing area.

How clean is the power for TJX Corporate Techno?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.