Colosseum Online Inc.
Colosseum Online Inc. is an operational data center in Toronto, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Address | Petrolia Road 800, M3J 3K4, Toronto |
| Coordinates | 43.77937, -79.48978 |
| Website | colosseum.com |
Power and grid
| Nearest high-voltage substation | Bathurst TS, 230 kV, 3.8 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 5.2 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 307 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Colosseum Online Inc. to the power grid?
The nearest high-voltage substation in OpenStreetMap is Bathurst TS (230 kV), about 3.8 km away.
How clean is the power for Colosseum Online Inc.?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Data centers near Toronto
- Hut 8 GTA2 3.8 km
- Digital Realty Toronto YYZ11 4.1 km · 69 MW
- Digital Realty YYZ11 Toronto (1 Century) 4.4 km
- Serverfarm TOR1 Toronto 6.3 km
- 210 Sheppard Avenue East 7.3 km
- Urbacon Data Centre 11.4 km · 24 MW
- EdgeConneX Toronto (EDCTOR01) 12.3 km · 5.3 MW
- Rogers Data Center 12.4 km · 7.9 MW