Comcast data center in Greenwood
Comcast data center in Greenwood is an operational data center operated by Comcast in Greenwood, United States. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Comcast |
| Facility power | 0.7 MW (range 0.3 MW to 1.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 563 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 47.69332, -122.31732 |
Power and grid
| Nearest high-voltage substation | North Substation, 115 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | East Pine Substation, 230 kV, 8.8 km away |
| HV substations within 10 km | 7 |
| Utility | City Of Seattle (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SCL |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 15.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 208 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Comcast data center in Greenwood use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
How close is Comcast data center in Greenwood to the power grid?
The nearest high-voltage substation in OpenStreetMap is North Substation (115 kV), about 1 km away. The local utility is City Of Seattle, in the SCL balancing area.
How clean is the power for Comcast data center in Greenwood?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Comcast data center in Greenwood?
Comcast.
Data centers near Greenwood
- Level(3) Seattle (Denny Way) 8.4 km · 30 MW
- KOMO Plaza Seattle (Formerly Fisher Plaza) 8.6 km · 38 MW
- Digital Fortress (SEA) 8.9 km · 13 MW
- Digital Realty Seattle SEA10 8.9 km · 13 MW
- Equinix SE3 Data Center 8.9 km · 11 MW
- SBTC 9.2 km
- Kanobe, LLC 13.5 km
- BOTHWAXB - Bothell Central Office 13.9 km
More Comcast data centers
- Comcast United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.