Comcast data center in Greenwood

Comcast data center in Greenwood is an operational data center operated by Comcast in Greenwood, United States. Our footprint estimate of its power is about 0.7 MW.

Key facts

StatusOperational
OperatorComcast
Facility power0.7 MW (range 0.3 MW to 1.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 563 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.69332, -122.31732

Power and grid

Nearest high-voltage substationNorth Substation, 115 kV, 1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationEast Pine Substation, 230 kV, 8.8 km away
HV substations within 10 km7
UtilityCity Of Seattle (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authoritySCL
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 15.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km208 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days79 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.42 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Comcast data center in Greenwood use?

We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.

How close is Comcast data center in Greenwood to the power grid?

The nearest high-voltage substation in OpenStreetMap is North Substation (115 kV), about 1 km away. The local utility is City Of Seattle, in the SCL balancing area.

How clean is the power for Comcast data center in Greenwood?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.

Who operates Comcast data center in Greenwood?

Comcast.