Quality Technology Services data center in New Albany is a data center under construction operated by Quality Technology Services in New Albany, United States. Our footprint estimate of its power is about 27 MW.

Key facts

StatusUnder construction
OperatorQuality Technology Services
Facility power27 MW (range 11 MW to 67 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 224,830 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 12,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asQTS NAL1 DC1 · QTS NAL1 DC2
Opened2024-04-01
Coordinates40.06351, -82.75852

Power and grid

Nearest high-voltage substationQTS NAL-1 Substation, 138 kV, 300 m away (Quality Technology Services)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationBabbitt Substation, 345 kV, 1.9 km away
HV substations within 10 km29
UtilityLicking Rural Electric INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 5.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km9 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Quality Technology Services data center in New Albany use?

We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.

How close is Quality Technology Services data center in New Albany to the power grid?

The nearest high-voltage substation in OpenStreetMap is QTS NAL-1 Substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.

How clean is the power for Quality Technology Services data center in New Albany?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates Quality Technology Services data center in New Albany?

Quality Technology Services.

Data centers near New Albany

More Quality Technology Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.