NAO 1/NAO 2
NAO 1/NAO 2 is an operational data center operated by Meta in New Albany, United States. Our footprint estimate of its power is about 120 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 120 MW (range 60 MW to 193 MW) Estimate from building footprint, low confidence. Footprint estimate: about 100,384 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 51,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.06842, -82.75031 |
Power and grid
| Nearest high-voltage substation | Babbitt Substation, 138 kV, 800 m away (American Electric Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Babbitt Substation, 345 kV, 1 km away |
| HV substations within 10 km | 26 |
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 5.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NAO 1/NAO 2 use?
We estimate the facility power at about 120 MW. Estimate from building footprint, low confidence.
What chips does NAO 1/NAO 2 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is NAO 1/NAO 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Babbitt Substation (138 kV), about 800 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.
How clean is the power for NAO 1/NAO 2?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates NAO 1/NAO 2?
Meta.
Data centers near New Albany
- Google New Albany 366 m · 400 MW
- Meta New Albany Data Center 461 m · 119 MW
- Meta LCO 3 Project 813 m · 174 MW
- Quality Technology Services data center in New Albany 886 m · 27 MW
- NAO 5/NAO 6 896 m · 88 MW
- LCO 1 1.1 km · 44 MW
- Google NBY-1 1.4 km · 27 MW
- Data center in New Albany 1.5 km · 18 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.