Google Storey County

Google Storey County is an operational data center that is still expanding, operated by Google in Paradise, United States. Its power is about 214 MW, growing to about 389 MW by 2027-06. Epoch AI estimates about 134,000 H100-equivalent AI chips (TPU v5e, TPU v4, TPU v6e, TPU v5p).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorGoogle
UsersGoogle DeepMind (speculative)
Facility power214 MW
Reported (Epoch AI or owner data)
IT power161 MW
Planned power389 MW by 2027-06-30
Epoch AI timeline projection.
AI compute134,000 H100-equivalents → 541,000 planned
AI chipsTPU v5e, TPU v4, TPU v6e, TPU v5p
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 89,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 6.1 billion → 11.4 billion planned
Epoch AI estimate, 2025 USD.
Coordinates36.08610, -115.16110 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2019-03-1800Land clearing begins.
2023-08-30107 MW35,000Building 1, which was first operational in 2021, has increased power capacity by about 75%. This is based on the expansion of the dry cooling array from 4 to 7 columns (seen on [Google Earth](https://earth.google.com/web/@39.4948785,-119.43174359,1568.8659293a,562.69639351d,35y,-0h,0t,0r/)). Its backup generators also grew from 18 to 33, an 83% increase. Around this time (2023 Q3) the quarterly PUE of the campus is 1.24, down from the initial 1.29 in 2022 Q3. Since no other buildings have been added, these changes indicate an increase in power density, which may entail a new generation of hardware getting installed.
2025-03-11107 MW35,000Building 2 now has generators in place, but there is still a crane and construction work present.
2025-06-30214 MW134,000Building 2 is operational. Based on a [Google Earth image](https://earth.google.com/web/@39.49733738,-119.43113543,1552.05877612a,1467.7067385d,35y,0h,0t,0r/) showing complete building shell, mechanical equipment and generators, plus cars parked at the front.
2025-09-28214 MW134,000Building 3 foundation is underway. Building 2 exterior looks totally clean/landscaped.
2026-04-13214 MW134,000Building 3 has a partially complete shell, electrical and mechanical equipment. Building 4 foundation is underway.
2027-06-30 (projected)389 MW541,000Building 3 is estimated to be operational. We estimate the operational date by analogy to the time that Building 1 took to go from a foundation to being operational. The power capacity is based on the number of generators reported in an air quality permit [application](https://ndep-onbase.nv.gov/api/Document/AeFo%C3%89pjclbkomJ7CWpPryLOjA6FQT9HFrkSuMWbMXTpKCzSR%C3%81W1f8zzFhGhik1iZCcNSpuTRRqNXD1inrrpBxtA%3D/) (p.92-93). The dry cooler array is more than double the size of the Building 1 array, which suggests an even larger power capacity than we estimate, but we believe the generator-based estimate is more reliable here.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2023-08-30TPU v5e153,165Estimate
2023-08-30TPU v434,609Estimate
2025-06-30TPU v6e98,179Estimate
2025-06-30TPU v5p16,521Estimate

Satellite view

Questions

How much power does Google Storey County use?

Public data puts the facility power at about 214 MW, with about 389 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does Google Storey County use?

Reported chips: TPU v5e, TPU v4, TPU v6e, TPU v5p.

Who operates Google Storey County?

Google. Reported users: Google DeepMind.

Data centers near Paradise

More Google data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.