Google Omaha
Google Omaha is an operational data center that is still expanding, operated by Google in Omaha, United States. Its power is about 284 MW, growing to about 474 MW by 2028-07. Epoch AI estimates about 199,000 H100-equivalent AI chips (TPU v5e, TPU v5p, TPU v6e, TPU v7).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | |
| Users | Google DeepMind (speculative) |
| Facility power | 284 MW Reported (Epoch AI or owner data) |
| IT power | 237 MW |
| Planned power | 474 MW by 2028-07-23 Epoch AI timeline projection. |
| AI compute | 199,000 H100-equivalents → 904,000 planned |
| AI chips | TPU v5e, TPU v5p, TPU v6e, TPU v7 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 130,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 9.0 billion → 15.0 billion planned Epoch AI estimate, 2025 USD. |
| Address | 11110 State St, Omaha, NE 68142 |
| Coordinates | 41.33568, -96.05236 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-11-25 | 0 | 0 | Land clearing begins. |
| 2024-04-08 | 95 MW | 40,000 | Building 1 operational, based on it being 6 months after roof was complete, infrastructure looked complete for 5 months. |
| 2024-07-29 | 95 MW | 40,000 | Building 2 has 3 cooling towers installed. |
| 2024-11-19 | 189 MW | 88,000 | Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed (finishing the cooling towers). |
| 2025-03-16 | 189 MW | 88,000 | Confirmation that there's no obvious construction happening for Building 2. Building 3 roof started. |
| 2025-04-21 | 189 MW | 88,000 | Confident that Building 2 is operational |
| 2025-10-21 | 189 MW | 88,000 | Building 3 has all backup generators in place but they are still being installed. Two cooling towers have fans on them, with more underway. To the south of Building 3, more land has been cleared and there's a new carpark. This suggests another building will soon start construction. |
| 2026-05-15 | 189 MW | 88,000 | Building 3 appears almost complete, with only minimal construction work and equipment remaining. The cooling towers are spaced apart in an unusual way, but there's no obvious sign that more will be installed before operation. Buildings 4 and 5 haven't started construction yet, the cleared land is still empty. |
| 2026-06-30 | 284 MW | 199,000 | Building 3 is operational (estimate). Based on there being minimal construction work as of May 15. |
| 2028-01-23 (projected) | 379 MW | 503,000 | Building 4 is operational. Expect a 4th building because there's enough land cleared for it. Assuming the foundation starts at the end of May 2026 and it takes a similar time to Building 3 from foundation to operational (1 year 8 months). |
| 2028-07-23 (projected) | 474 MW | 904,000 | Building 5 is operational. We expect a 5th building because there's enough land cleared for one. We assume a roughly 6-month delay after Building 4. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-04-08 | TPU v5e | 179,798 | Estimate |
| 2024-04-08 | TPU v5p | 9,028 | Estimate |
| 2024-11-19 | TPU v5e | 263,957 | Estimate |
| 2024-11-19 | TPU v5p | 47,061 | Estimate |
| 2024-11-19 | TPU v6e | 15,411 | Estimate |
| 2026-06-30 | TPU v6e | 28,846 | Estimate |
| 2026-06-30 | TPU v7 | 41,901 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Omaha use?
Public data puts the facility power at about 284 MW, with about 474 MW planned by 2028. Reported (Epoch AI or owner data).
What chips does Google Omaha use?
Reported chips: TPU v5e, TPU v5p, TPU v6e, TPU v7.
Who operates Google Omaha?
Google. Reported users: Google DeepMind.
Data centers near Omaha
- Union Pacific Jack Koraleski Technology, Research & Development Center 2.0 km · 7.3 MW
- Verizon 2.0 km · 13 MW
- Google 2.7 km · 60 MW
- Google Omaha Data Center 3.3 km · 238 MW
- Google 3.6 km · 28 MW
- Scott Data Center 10.7 km · 7.9 MW
- First National Technical Center 12.7 km · 7.2 MW
- 1623 Farnam 12.9 km · 3 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
- Google Cedar Rapids United States