Google is an operational data center operated by Google in Hillsborough, United States. Our footprint estimate of its power is about 60 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 60 MW (range 30 MW to 96 MW) Estimate from building footprint, low confidence. Footprint estimate: about 50,001 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 26,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.33914, -96.08466 |
Power and grid
| Utility | Omaha Public Power District (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SWPP |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 4.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 460 g CO₂ per kWh (Nebraska, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7% |
| Industrial power price | USD 0.084 per kWh (Nebraska, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 657 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.16 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Extremely High (>80%) (Nebraska) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google use?
We estimate the facility power at about 60 MW. Estimate from building footprint, low confidence.
What chips does Google use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Google?
The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.
Who operates Google?
Google.
Data centers near Hillsborough
- Google Omaha Data Center 629 m · 238 MW
- Google 1.0 km · 28 MW
- Google Omaha 2.7 km · 284 MW
- Union Pacific Jack Koraleski Technology, Research & Development Center 3.7 km · 7.3 MW
- Verizon 4.7 km · 13 MW
- Scott Data Center Omaha 12.1 km · 7.9 MW
- Verizon Wireless data center in Omaha 14.2 km · 4.8 MW
- First National Technical Center 15.1 km · 7.2 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data