Google Lincoln
Google Lincoln is an operational data center that is still expanding, operated by Google in Lincoln, United States. Its power is about 170 MW, growing to about 339 MW by 2027-10. Epoch AI estimates about 198,000 H100-equivalent AI chips (TPU v6e, TPU v7).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | |
| Facility power | 170 MW Reported (Epoch AI or owner data) |
| IT power | 141 MW |
| Planned power | 339 MW by 2027-10-01 Epoch AI timeline projection. |
| AI compute | 198,000 H100-equivalents → 672,000 planned |
| AI chips | TPU v6e, TPU v7 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 78,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 5.3 billion → 10.7 billion planned Epoch AI estimate, 2025 USD. |
| Address | 5475 Cloud Ct, Lincoln, NE 68514 |
| Coordinates | 40.90747, -96.64578 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-06-01 | 0 | 0 | Land clearing begins. |
| 2025-10-23 | 0 | 0 | Building 1 looks mostly complete: the large items like generators and substation are done. It is just missing 2 more cooling towers (4 fans). They just seem to be paving and setting up the secondary equipment so it is probably a few months away from operation. Building 2 foundation has been laid. |
| 2026-05-12 | 170 MW | 198,000 | Building 1 operational. This is based on the fact that is no more visible equipment or construction around the building, and based on previous imagery and when construction started on the last pieces of equipment (fans). Building 2's roof is complete, with generator construction more than halfway complete and cooling construction beginning. Electrical equipment on the side of Building 2 is also around halfway complete. |
| 2027-10-01 (projected) | 339 MW | 672,000 | Building 2 operational. Estimated based on the construction timeline for Building 1, specifically the time to operational since the roof was complete and the time to operational since the foundation work began. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-05-12 | TPU v6e | 24,067 | Estimate |
| 2026-05-12 | TPU v7 | 75,060 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Lincoln use?
Public data puts the facility power at about 170 MW, with about 339 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Google Lincoln use?
Reported chips: TPU v6e, TPU v7.
Who operates Google Lincoln?
Google.
Data centers near Lincoln
- Google Lincoln Data Center 651 m · 276 MW
- Meta Sarpy 47.3 km · 105 MW
- Sarpy Meta Data Center 47.7 km · 128 MW
- Meta Sarpy Data center 48.0 km · 79 MW
- Meta Sarpy Data center 48.1 km · 151 MW
- Google 48.2 km · 25 MW
- Sarpy Meta Data Center 48.4 km · 52 MW
- Travelers Insurance 48.6 km · 17 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Cedar Rapids United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.