Data Center Directory

Meta Sarpy Data center

Meta Sarpy Data center is an operational data center operated by Meta in Chalco, United States. Our footprint estimate of its power is about 79 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power79 MW (range 40 MW to 127 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 66,240 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 34,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.11225, -96.14162

Power and grid

Nearest high-voltage substation150th St & Capehart Rd Substation, 161 kV, 700 m away (Omaha Public Power District)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 2.6 km away
HV substations within 10 km17
UtilityOmaha Public Power District (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authoritySWPP
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 900 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.2 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity460 g CO₂ per kWh (Nebraska, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7%
Industrial power priceUSD 0.084 per kWh (Nebraska, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.1 °C (2001 to 2025)
Cooling degree days707 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.16 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayExtremely High (>80%) (Nebraska)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Meta Sarpy Data center use?

We estimate the facility power at about 79 MW. Estimate from building footprint, low confidence.

What chips does Meta Sarpy Data center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How close is Meta Sarpy Data center to the power grid?

The nearest high-voltage substation in OpenStreetMap is 150th St & Capehart Rd Substation (161 kV), about 700 m away. The local utility is Omaha Public Power District, in the SWPP balancing area.

How clean is the power for Meta Sarpy Data center?

The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.

Who operates Meta Sarpy Data center?

Meta.

Data centers near Chalco

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.