Sarpy Meta Data Center is an operational data center in Chalco, United States. Our footprint estimate of its power is about 128 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
Facility power128 MW (range 51 MW to 319 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,064,931 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 55,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.11238, -96.14573

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 500 m away (Omaha Public Power District)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 2.5 km away
HV substations within 10 km17
UtilityOmaha Public Power District (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authoritySWPP
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 500 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.2 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity460 g CO₂ per kWh (Nebraska, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7%
Industrial power priceUSD 0.084 per kWh (Nebraska, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.1 °C (2001 to 2025)
Cooling degree days707 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.16 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayExtremely High (>80%) (Nebraska)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Sarpy Meta Data Center use?

We estimate the facility power at about 128 MW. Estimate from building footprint, low confidence.

What chips does Sarpy Meta Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How close is Sarpy Meta Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 500 m away. The local utility is Omaha Public Power District, in the SWPP balancing area.

How clean is the power for Sarpy Meta Data Center?

The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.