Meta Sarpy
Meta Sarpy is an operational AI data center operated by Meta in Springfield, United States. Its power is about 105 MW. Epoch AI estimates about 92,000 H100-equivalent AI chips (B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Users | Meta |
| Facility power | 105 MW Reported (Epoch AI or owner data) |
| IT power | 80 MW |
| AI compute | 92,000 H100-equivalents |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 44,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 3.0 billion Epoch AI estimate, 2025 USD. |
| Address | 14436-14998 Fairview Rd, Springfield, NE 68059, USA |
| Coordinates | 41.08184, -96.13109 (city level) |
Power and grid
| Utility | Omaha Public Power District (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SWPP |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 460 g CO₂ per kWh (Nebraska, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7% |
| Industrial power price | USD 0.084 per kWh (Nebraska, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.1 °C (2001 to 2025) |
| Cooling degree days | 707 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.16 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Extremely High (>80%) (Nebraska) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-08-01 | 0 | 0 | Building 1 grading underway. |
| 2026-05-04 | 0 | 0 | Building 1 shell, electrical and cooling equipment looks complete, with minimal construction work, so we expect it to be operational within 3 months. |
| 2026-08-02 | 105 MW | 92,000 | Building 1 is operational (estimate). |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-08-02 | B300 | 36,300 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Sarpy use?
Public data puts the facility power at about 105 MW. Reported (Epoch AI or owner data).
What chips does Meta Sarpy use?
Reported chips: B300.
How clean is the power for Meta Sarpy?
The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.
Who operates Meta Sarpy?
Meta. Reported users: Meta.
Data centers near Springfield
- Meta Sarpy Data center 3.5 km · 79 MW
- Sarpy Meta Data Center 3.6 km · 128 MW
- Meta Sarpy Data center 3.7 km · 151 MW
- Sarpy Meta Data Center 4.5 km · 56 MW
- Sarpy Meta Data Center 4.6 km · 52 MW
- Travelers Insurance 5.3 km · 17 MW
- Google 6.0 km · 25 MW
- Google 6.2 km · 25 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.