Data Center Directory

Data center in Tulsa

Data center in Tulsa is an operational data center in Tulsa, United States. Our footprint estimate of its power is about 0.7 MW.

Key facts

StatusOperational
Facility power0.7 MW (range 0.4 MW to 1.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 603 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressEast 56th Street South 10920, 74146, Tulsa
Coordinates36.08125, -95.85415

Power and grid

UtilityLake Region Electric Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityAECI
Nearest gas pipelineONEOK Gas Transportation LLC, intrastate pipeline, 100 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity343 g CO₂ per kWh (Oklahoma, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1%
Industrial power priceUSD 0.082 per kWh (Oklahoma, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature15.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature47 °C (2001 to 2025)
Cooling degree days1,182 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.48 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow - Medium (10-20%) (Oklahoma)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Tulsa use?

We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Tulsa?

The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.

Data centers near Tulsa

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.