Jackson Technical Datacenter
Jackson Technical Datacenter is an operational data center operated by Jackson Technical in Tulsa, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Jackson Technical |
| Networks | 1 networks PeeringDB. |
| Address | 611 S Elgin Ave |
| Coordinates | 36.15194, -95.98434 |
| Website | jacksontechnical.com |
Power and grid
| Utility | Lake Region Electric Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | AECI |
| Nearest gas pipeline | TransOk Pipeline Co, interstate pipeline, 4.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 47 °C (2001 to 2025) |
| Cooling degree days | 1,182 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.48 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Jackson Technical Datacenter?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Who operates Jackson Technical Datacenter?
Jackson Technical.
Data centers near Tulsa
- 321 S Boston Ave 460 m
- TulsaConnect 699 m
- TierPoint Tulsa-Archer 852 m · 2.8 MW
- Lumen Tulsa 1 979 m
- OneNet OSU Tulsa 1.3 km
- Cherokee Data Center 14.0 km · 45 MW
- Data center in Tulsa 14.1 km · 0.7 MW
- TulsaConnect DC3 14.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.