Cherokee Data Center
Cherokee Data Center is an operational data center in Tulsa, United States. Our footprint estimate of its power is about 45 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 45 MW (range 22 MW to 72 MW) Estimate from building footprint, low confidence. Footprint estimate: about 37,493 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 19,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | North Lakewood Avenue 7400, 74073, Tulsa |
| Coordinates | 36.26255, -95.91004 |
Power and grid
| Utility | Verdigris Valley Elec Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | AECI |
| Nearest gas pipeline | ONEOK Gas Transportation LLC, intrastate pipeline, 8.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cherokee Data Center use?
We estimate the facility power at about 45 MW. Estimate from building footprint, low confidence.
How clean is the power for Cherokee Data Center?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Data centers near Tulsa
- OneNet OSU Tulsa 13.0 km
- TierPoint Tulsa-Archer 13.5 km · 2.8 MW
- Lumen Tulsa 1 13.9 km
- Jackson Technical Datacenter 14.0 km
- 321 S Boston Ave 14.1 km
- TulsaConnect 14.6 km
- TulsaConnect DC3 19.2 km
- TulsaConnect DC3 19.3 km