Google Lenoir Data Center
Google Lenoir Data Center is an operational data center operated by Google in Lenoir, United States. Our footprint estimate of its power is about 17 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 17 MW (range 6.9 MW to 43 MW) Estimate from building footprint, low confidence. Footprint estimate: about 143,767 m² site outline x 0.12 kW per m² of land. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Lynhaven Drive 708 |
| Coordinates | 35.89854, -81.54754 |
Power and grid
| Utility | Blue Ridge Elec Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | DUK |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 747 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Lenoir Data Center use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
What chips does Google Lenoir Data Center use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Google Lenoir Data Center?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates Google Lenoir Data Center?
Google.
Data centers near Lenoir
- Google Project Cardinal 640 m · 40 MW
- 801 Main Street - Lenoir 2.7 km
- Data center in Newton 42.7 km · 58 MW
- Apple - Maiden Data Center 43.0 km · 87 MW
- Data center in Newton 43.3 km · 53 MW
- Meta Forest City Data Center 69.5 km · 64 MW
- Meta 69.5 km · 71 MW
- T5@Charlotte 73.4 km · 5.8 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.