Google Lenoir Data Center

Google Lenoir Data Center is an operational data center operated by Google in Lenoir, United States. Our footprint estimate of its power is about 17 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).

Key facts

StatusOperational
OperatorGoogle
Facility power17 MW (range 6.9 MW to 43 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 143,767 m² site outline x 0.12 kW per m² of land.
AI chipsGoogle TPU (plus NVIDIA GPUs for cloud customers)
Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips.
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressLynhaven Drive 708
Coordinates35.89854, -81.54754

Power and grid

UtilityBlue Ridge Elec Member Corp (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityDUK
Grid carbon intensity350 g CO₂ per kWh (North Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9%
Industrial power priceUSD 0.082 per kWh (North Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days747 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.23 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayHigh (40-80%) (North Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Google Lenoir Data Center use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

What chips does Google Lenoir Data Center use?

No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).

How clean is the power for Google Lenoir Data Center?

The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.

Who operates Google Lenoir Data Center?

Google.