Apple - Maiden Data Center
Apple - Maiden Data Center is an operational data center in Newton, United States. Our footprint estimate of its power is about 87 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 87 MW (range 35 MW to 217 MW) Estimate from building footprint, low confidence. Footprint estimate: about 722,566 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 37,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.58876, -81.26231 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 100 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Orchard Tie Substation, 230 kV, 1.6 km away |
| HV substations within 10 km | 18 |
| Utility | Rutherford Elec Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 6.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 9.4 GW in 74 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.2 °C (2001 to 2025) |
| Cooling degree days | 931 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.44 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Apple - Maiden Data Center use?
We estimate the facility power at about 87 MW. Estimate from building footprint, low confidence.
How close is Apple - Maiden Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 500 m away. The local utility is Rutherford Elec Member Corp, in the DUK balancing area.
How clean is the power for Apple - Maiden Data Center?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Data centers near Newton
- Data center in Newton 264 m · 53 MW
- Data center in Newton 273 m · 58 MW
- T5@Charlotte 39.5 km · 5.8 MW
- Google Project Cardinal 42.4 km · 40 MW
- Google Lenoir Data Center 43.0 km · 17 MW
- 801 Main Street - Lenoir 44.9 km
- CLT2 52.8 km
- DC74-CLT1 52.9 km