Data Center Directory

CLT2

CLT2 is an operational data center operated by LUMOS Networks in Charlotte, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorLUMOS Networks
Networks7 networks
PeeringDB.
Address3101 International Airport Dr.
Coordinates35.19376, -80.93849
Websitedc74.com

Power and grid

UtilityDuke Energy Carolinas, LLC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityDUK
Nearest gas pipelineSouth Carolina PL Corp, interstate pipeline, 19.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity350 g CO₂ per kWh (North Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9%
Industrial power priceUSD 0.082 per kWh (North Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days1,068 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.47 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayHigh (40-80%) (North Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for CLT2?

The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.

Who operates CLT2?

LUMOS Networks.

Data centers near Charlotte

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.