DC74-CLT4
DC74-CLT4 is an operational data center operated by DC74 Data Centers in Charlotte, United States. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DC74 Data Centers |
| Facility power | 1.6 MW (range 0.8 MW to 2.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,334 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | SEGRA |
| Address | 1612 Cross Beam Dr. |
| Coordinates | 35.18008, -80.92639 |
| Website | dc74.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 100 kV, 800 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Woodlawn Substation, 230 kV, 3.9 km away |
| HV substations within 10 km | 33 |
| Utility | Duke Energy Carolinas, LLC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 17.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 12 GW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,068 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.47 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DC74-CLT4 use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
How close is DC74-CLT4 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 800 m away. The local utility is Duke Energy Carolinas, LLC, in the DUK balancing area.
How clean is the power for DC74-CLT4?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates DC74-CLT4?
DC74 Data Centers.
Data centers near Charlotte
- Level(3) Charlotte 221 m
- Carolina Internet / CaroNet XB 548 m
- Carolina Internet / CaroNet 752 m
- ScaleMatrix Charlotte Data Center US-East 01 788 m · 13 MW
- DC74-CLT1 1.8 km
- CLT2 1.9 km
- Spectrum Charlotte National Data Center 4.2 km · 15 MW
- Flexential - Charlotte/South (CLT1/2/3) 5.1 km · 13 MW
More DC74 Data Centers data centers
- DC74-CLT1 United States
Sources
Correct this page or get the data