Level(3) Charlotte
Level(3) Charlotte is an operational data center operated by Lumen Technologies in Charlotte, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Address | 4021 Rose Lake Drive |
| Coordinates | 35.17868, -80.92813 |
| Website | lumen.com |
Power and grid
| Utility | Duke Energy Carolinas, LLC (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | DUK |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 17.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,068 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.47 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Level(3) Charlotte?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates Level(3) Charlotte?
Lumen Technologies.
Data centers near Charlotte
- DC74-CLT4 221 m · 1.6 MW
- Carolina Internet / CaroNet XB 379 m
- ScaleMatrix Charlotte Data Center US-East 01 622 m · 13 MW
- Carolina Internet / CaroNet 627 m
- DC74-CLT1 1.9 km
- CLT2 1.9 km
- Spectrum Charlotte National Data Center 4.1 km · 15 MW
- Flexential - Charlotte/South (CLT1/2/3) 4.9 km · 13 MW
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.