Flexential - Charlotte/South (CLT1/2/3)
Flexential - Charlotte/South (CLT1/2/3) is an operational data center operated by Flexential in Charlotte, United States. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 13 MW (range 6.6 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,529 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | Flexential Charlotte - South |
| Address | 8910 Lenox Pointe Drive, Suite A |
| Coordinates | 35.13537, -80.93693 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 100 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Woodlawn Substation, 230 kV, 6.5 km away |
| HV substations within 10 km | 29 |
| Utility | Duke Energy Carolinas, LLC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 12.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 9.6 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,068 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.47 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Charlotte/South (CLT1/2/3) use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is Flexential - Charlotte/South (CLT1/2/3) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 1 km away. The local utility is Duke Energy Carolinas, LLC, in the DUK balancing area.
How clean is the power for Flexential - Charlotte/South (CLT1/2/3)?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates Flexential - Charlotte/South (CLT1/2/3)?
Flexential.
Data centers near Charlotte
- Spectrum Charlotte National Data Center 2.1 km · 15 MW
- ScaleMatrix Charlotte Data Center US-East 01 4.3 km · 13 MW
- Carolina Internet / CaroNet 4.3 km
- Carolina Internet / CaroNet XB 4.9 km
- Level(3) Charlotte 4.9 km
- DC74-CLT4 5.1 km · 1.6 MW
- CLT2 6.5 km
- DC74-CLT1 6.5 km
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.