Data center in Newton
Data center in Newton is an operational data center in Newton, United States. Our footprint estimate of its power is about 58 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 58 MW (range 29 MW to 92 MW) Estimate from building footprint, low confidence. Footprint estimate: about 47,921 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 25,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.59039, -81.26457 |
Power and grid
| Utility | Rutherford Elec Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | DUK |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 6.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Newton use?
We estimate the facility power at about 58 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Newton?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Data centers near Newton
- Apple - Maiden Data Center 273 m · 87 MW
- Data center in Newton 537 m · 53 MW
- T5@Charlotte 39.6 km · 5.8 MW
- Google Project Cardinal 42.2 km · 40 MW
- Google Lenoir Data Center 42.7 km · 17 MW
- 801 Main Street - Lenoir 44.6 km
- CLT2 53.1 km
- DC74-CLT1 53.1 km