Data center in Newton

Data center in Newton is an operational data center in Newton, United States. Our footprint estimate of its power is about 58 MW.

Key facts

StatusOperational
Facility power58 MW (range 29 MW to 92 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 47,921 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 25,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates35.59039, -81.26457

Power and grid

UtilityRutherford Elec Member Corp (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityDUK
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 6.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity350 g CO₂ per kWh (North Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9%
Industrial power priceUSD 0.082 per kWh (North Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayHigh (40-80%) (North Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Newton use?

We estimate the facility power at about 58 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Newton?

The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.

Data centers near Newton

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.