Data Center Directory

Meta Forest City Data Center

Meta Forest City Data Center is an operational data center operated by Meta in Forest City, United States. Our footprint estimate of its power is about 64 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power64 MW (range 26 MW to 161 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 536,196 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 27,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMeta
Coordinates35.31582, -81.82430
Websitefacebook.com/ForestCityDataCenter

Power and grid

UtilityTown Of Forest City
Electric retail service territory (HIFLD, US government).
Balancing authorityDUK
Nearest gas pipelinePublic Service Co of NC, intrastate pipeline, 3.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity350 g CO₂ per kWh (North Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9%
Industrial power priceUSD 0.082 per kWh (North Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayHigh (40-80%) (North Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Meta Forest City Data Center use?

We estimate the facility power at about 64 MW. Estimate from building footprint, low confidence.

What chips does Meta Forest City Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How clean is the power for Meta Forest City Data Center?

The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.

Who operates Meta Forest City Data Center?

Meta.

Data centers near Forest City

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.