NorthMark Strategies Data Center
NorthMark Strategies Data Center is an operational data center in Spartanburg, United States. Our footprint estimate of its power is about 47 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 47 MW (range 19 MW to 117 MW) Estimate from building footprint, low confidence. Footprint estimate: about 389,361 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 20,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.92328, -81.84991 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 100 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Pacolet Tie Substation, 230 kV, 9.6 km away |
| HV substations within 10 km | 10 |
| Utility | Duke Energy Carolinas, LLC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 5.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.5 GW in 54 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 288 g CO₂ per kWh (South Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3% |
| Industrial power price | USD 0.079 per kWh (South Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 994 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.44 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Medium - High (20-40%) (South Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NorthMark Strategies Data Center use?
We estimate the facility power at about 47 MW. Estimate from building footprint, low confidence.
How close is NorthMark Strategies Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 300 m away. The local utility is Duke Energy Carolinas, LLC, in the DUK balancing area.
How clean is the power for NorthMark Strategies Data Center?
The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.
Data centers near Spartanburg
- DartPoints Spartanburg, SC - SPA1 18.6 km · 1.3 MW
- Meta 43.5 km · 71 MW
- Meta Forest City Data Center 43.7 km · 64 MW
- DartPoints Greenville, SC - GSP1 46.8 km
- DC BLOX GSP1 - DCBLOX Greenville 47.1 km
- CloudOgre 50.5 km
- T5@Charlotte 55.1 km · 5.8 MW
- QTS Charlotte (CTL1) 69.0 km