QTS Charlotte (CTL1)

QTS Charlotte (CTL1) is an operational data center operated by QTS Realty Trust in York, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorQTS Realty Trust
Address2143 Hands Mill Hwy
Coordinates35.03538, -81.10451
Websiteqtsdatacenters.com/data-centers/york

Power and grid

Nearest high-voltage substationCatawba 230kV Switching Station, 230 kV, 3.3 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
UtilityYork Electric Coop INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityDUK
Nearest gas pipelineSouth Carolina PL Corp, interstate pipeline, 7.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km11 GW in 47 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity288 g CO₂ per kWh (South Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3%
Industrial power priceUSD 0.079 per kWh (South Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days1,068 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.47 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayMedium - High (20-40%) (South Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is QTS Charlotte (CTL1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Catawba 230kV Switching Station (230 kV), about 3.3 km away. The local utility is York Electric Coop INC, in the DUK balancing area.

How clean is the power for QTS Charlotte (CTL1)?

The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.

Who operates QTS Charlotte (CTL1)?

QTS Realty Trust.

Data centers near York

More QTS Realty Trust data centers

Sources