Meta
Meta is an operational data center operated by Meta in Forest City, United States. Our footprint estimate of its power is about 71 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 71 MW (range 35 MW to 113 MW) Estimate from building footprint, low confidence. Footprint estimate: about 58,788 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 30,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.31426, -81.82206 |
Power and grid
| Utility | Town Of Forest City Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | DUK |
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 3.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta use?
We estimate the facility power at about 71 MW. Estimate from building footprint, low confidence.
What chips does Meta use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How clean is the power for Meta?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates Meta?
Meta.
Data centers near Forest City
- Meta Forest City Data Center 268 m · 64 MW
- CloudOgre 30.8 km
- T5@Charlotte 39.4 km · 5.8 MW
- DartPoints Spartanburg, SC - SPA1 40.2 km · 1.3 MW
- NorthMark Strategies Data Center 43.5 km · 47 MW
- Data center in Newton 59.1 km · 58 MW
- Apple - Maiden Data Center 59.2 km · 87 MW
- Data center in Newton 59.2 km · 53 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.