Lumen Cleveland
Lumen Cleveland is an operational data center in Cleveland, United States. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,659 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.50507, -81.65778 |
Power and grid
| Utility | City Of Cleveland (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 6.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 404 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.63 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lumen Cleveland use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
How clean is the power for Lumen Cleveland?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Data centers near Cleveland
- Fusion - Cleveland 1.9 km
- Zayo Cleveland - 1525 Rockwell Ave 2.2 km · 81 MW
- DataBank Cleveland (CLE1) 2.2 km
- Cogent Cleveland 2 2.7 km
- Tech Mahindra Cleveland 3.1 km
- Expedient Cleveland - 151 NEO 11.0 km
- T5@Cleveland 14.0 km · 15 MW
- T5@Cleveland 14.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.