Zayo Networks
Zayo Networks is an operational data center operated by Zayo in Louisville, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Zayo |
| Networks | 4 networks PeeringDB. |
| Address | 400 Centennial Parkway |
| Coordinates | 39.96496, -105.16526 |
| Website | zayonetworks.com |
Power and grid
| Nearest high-voltage substation | Louisville Substation, 115 kV, 3.8 km away (Public Service Company of Colorado) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Valmont Substation, 230 kV, 6.7 km away |
| HV substations within 10 km | 10 |
| Utility | Public Service Co Of Colorado (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 27.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.2 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 485 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.72 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Zayo Networks to the power grid?
The nearest high-voltage substation in OpenStreetMap is Louisville Substation (115 kV), about 3.8 km away. The local utility is Public Service Co Of Colorado, in the PSCO balancing area.
How clean is the power for Zayo Networks?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates Zayo Networks?
Zayo.
Data centers near Louisville
- LSVL-CTC1 3.5 km
- BLDR-1919 11.2 km
- DataBank Denver (DEN4) 11.5 km · 2.7 MW
- JPMorgan Chase 12.6 km · 29 MW
- Google - Thornton 16.2 km · 20 MW
- Sungard AS Thornton 20.6 km
- CoreSite - Denver (DE3) 26.4 km
- ColoradoColo - Lakewood (LKWD) 26.6 km
More Zayo data centers
- Zayo Cleveland - 1525 Rockwell Ave United States
- 10 Rue des Frères Peuge France
- NeoCenter Paris France
- Zayo Amsterdam Netherlands
- Zayo Baltimore - 111 Market Pl United States
- Zayo Minneapolis - 10300 6th Ave N United States
- Zayo Nashville - 209 10th Ave. S United States
- Zayo Pittsburgh - 2500 Allegheny Center Mall United States