Google - Thornton
Google - Thornton is an operational data center operated by Google in Thorton, United States. Our footprint estimate of its power is about 20 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 20 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,472 m² building outline x 2 floor(s) x 1.2 kW/m². |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 8,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Grant Street, Thorton |
| Coordinates | 39.92247, -104.98343 |
Power and grid
| Utility | Public Service Co Of Colorado (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 19.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 485 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.72 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google - Thornton use?
We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.
What chips does Google - Thornton use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Google - Thornton?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates Google - Thornton?
Google.
Data centers near Thorton
- JPMorgan Chase 8.1 km · 29 MW
- Sungard AS Thornton 8.4 km
- DataBank Denver (DEN4) 9.3 km · 2.7 MW
- LSVL-CTC1 12.9 km
- CoreSite - Denver (DE3) 15.3 km
- Iron Mountain Data Center - Denver (DEN-1) 16.2 km
- Zayo Networks 16.2 km
- 1500 Champa 19.7 km
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data