JPMorgan Chase

JPMorgan Chase is an operational data center operated by JPMorgan Chase in Broomfield, United States. Our footprint estimate of its power is about 29 MW.

Key facts

StatusOperational
OperatorJPMorgan Chase
Facility power29 MW (range 14 MW to 46 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 24,152 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 12,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWest 160th Avenue 2701, 80023, Broomfield
Coordinates39.98916, -105.02073

Power and grid

Nearest high-voltage substationParkway Substation, 115 kV, 1 km away (Tri-State Generation & Transmission;United Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationGreen Substation, 230 kV, 3.7 km away
HV substations within 10 km8
UtilityUnited Power, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityWACM
Nearest gas pipelineColorado Interstate Gas Co, interstate pipeline, 16.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.2 GW in 75 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity400 g CO₂ per kWh (Colorado, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6%
Industrial power priceUSD 0.100 per kWh (Colorado, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days485 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.72 kWh per m² per day
Wind at 50 m5.4 m/s average
Water stress todayExtremely High (>80%) (Colorado)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does JPMorgan Chase use?

We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.

How close is JPMorgan Chase to the power grid?

The nearest high-voltage substation in OpenStreetMap is Parkway Substation (115 kV), about 1 km away. The local utility is United Power, INC, in the WACM balancing area.

How clean is the power for JPMorgan Chase?

The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.

Who operates JPMorgan Chase?

JPMorgan Chase.