JPMorgan Chase is an operational data center operated by JPMorgan Chase in Broomfield, United States. Our footprint estimate of its power is about 29 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | JPMorgan Chase |
| Facility power | 29 MW (range 14 MW to 46 MW) Estimate from building footprint, low confidence. Footprint estimate: about 24,152 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | West 160th Avenue 2701, 80023, Broomfield |
| Coordinates | 39.98916, -105.02073 |
Power and grid
| Nearest high-voltage substation | Parkway Substation, 115 kV, 1 km away (Tri-State Generation & Transmission;United Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Green Substation, 230 kV, 3.7 km away |
| HV substations within 10 km | 8 |
| Utility | United Power, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WACM |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 16.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.2 GW in 75 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 485 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.72 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does JPMorgan Chase use?
We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.
How close is JPMorgan Chase to the power grid?
The nearest high-voltage substation in OpenStreetMap is Parkway Substation (115 kV), about 1 km away. The local utility is United Power, INC, in the WACM balancing area.
How clean is the power for JPMorgan Chase?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates JPMorgan Chase?
JPMorgan Chase.
Data centers near Broomfield
- Google - Thornton 8.1 km · 20 MW
- LSVL-CTC1 9.2 km
- Zayo Networks 12.6 km
- DataBank Denver (DEN4) 12.7 km · 2.7 MW
- Sungard AS Thornton 16.2 km
- BLDR-1919 22.1 km
- CoreSite - Denver (DE3) 23.2 km
- Iron Mountain Data Center - Denver (DEN-1) 24.0 km
More JPMorgan Chase data centers
- JPMorgan Chase data center in Totowa United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.