JPMorgan Chase data center in Totowa
JPMorgan Chase data center in Totowa is an operational data center operated by JPMorgan Chase in Totowa, United States. Our footprint estimate of its power is about 30 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | JPMorgan Chase |
| Facility power | 30 MW (range 15 MW to 48 MW) Estimate from building footprint, low confidence. Footprint estimate: about 24,893 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.90562, -74.23018 |
Power and grid
| Nearest high-voltage substation | Jackson Road Substation, 230 kV, 1.3 km away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 10 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 4.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 18 GW in 137 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does JPMorgan Chase data center in Totowa use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
How close is JPMorgan Chase data center in Totowa to the power grid?
The nearest high-voltage substation in OpenStreetMap is Jackson Road Substation (230 kV), about 1.3 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for JPMorgan Chase data center in Totowa?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates JPMorgan Chase data center in Totowa?
JPMorgan Chase.
Data centers near Totowa
- CyrusOne Totowa 1.0 km · 15 MW
- Credit Suisse: Clifton Data Center 11.0 km · 27 MW
- Digital Realty EWR (100 Delawanna) 12.1 km · 5 MW
- Digital Realty EWR (2 Peekay) 12.1 km · 14 MW
- BT Radianz: 492 River Road 12.4 km · 17 MW
- WhiteLabelITSolutions 15.3 km
- Cologix NNJ3 16.8 km
- 365 Data Centers Carlstadt (NJ3) 17.5 km
More JPMorgan Chase data centers
- JPMorgan Chase United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.