Cologix NNJ3
Cologix NNJ3 is an operational data center operated by Cologix in Parsippany, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cologix |
| Networks | 7 networks PeeringDB. |
| Address | 200 Webro Road |
| Coordinates | 40.85708, -74.41891 |
| Website | cologix.com |
Power and grid
| Nearest high-voltage substation | Stoneybrook Substation, 230 kV, 2.7 km away (Jersey Central Power and Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Jersey Central Power & Lt Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 17 GW in 152 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.4 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.77 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Cologix NNJ3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stoneybrook Substation (230 kV), about 2.7 km away. The local utility is Jersey Central Power & Lt Co, in the PJM balancing area.
How clean is the power for Cologix NNJ3?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates Cologix NNJ3?
Cologix.
Data centers near Parsippany
- Cologix NNJ2 3.8 km
- CyrusOne Totowa 15.9 km · 15 MW
- JPMorgan Chase data center in Totowa 16.8 km · 30 MW
- Credit Suisse: Clifton Data Center 23.6 km · 27 MW
- BT Radianz: 492 River Road 24.3 km · 17 MW
- Equinix NY1 - New York, Newark 24.6 km · 12 MW
- Digital Realty EWR (100 Delawanna) 24.8 km · 5 MW
- Digital Realty EWR (2 Peekay) 24.9 km · 14 MW
More Cologix data centers
- Cologix ASH1 United States
- Cologix TOR4 Canada
- Cologix MTL8 Canada
- Cologix MIN1 United States
- Cologix COL4 United States
- Cologix COL1 United States
- Cologix CGY1 Canada
- Cologix JAX2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.