Cologix NNJ2

Cologix NNJ2 is an operational data center operated by Cologix in Cedar Knolls, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCologix
Networks3 networks
PeeringDB.
Address9 Wing Drive
Coordinates40.83182, -74.44879
Websitecologix.com

Power and grid

Nearest high-voltage substationStoneybrook Substation, 230 kV, 1.9 km away (Jersey Central Power and Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
UtilityJersey Central Power & Lt Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineAlgonquin Gas Trans Co, interstate pipeline, 1.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km17 GW in 155 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.4 °C (2001 to 2025)
Cooling degree days465 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.77 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Cologix NNJ2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stoneybrook Substation (230 kV), about 1.9 km away. The local utility is Jersey Central Power & Lt Co, in the PJM balancing area.

How clean is the power for Cologix NNJ2?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates Cologix NNJ2?

Cologix.

Data centers near Cedar Knolls

More Cologix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.