365 Data Centers Carlstadt (NJ3)
365 Data Centers Carlstadt (NJ3) is an operational data center operated by 365 Data Centers in Carlstadt, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | 365 Data Centers |
| Networks | 4 networks PeeringDB. |
| Address | 410 Commerce Blvd |
| Coordinates | 40.82795, -74.04942 |
| Website | 365datacenters.com/carlstadt-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 2.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 26 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 20 GW in 135 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is 365 Data Centers Carlstadt (NJ3) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 2.5 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for 365 Data Centers Carlstadt (NJ3)?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates 365 Data Centers Carlstadt (NJ3)?
365 Data Centers.
Data centers near Carlstadt
- Sungard AS Carlstadt 777 429 m
- Equinix NY7 - New York, North Bergen 3.8 km · 12 MW
- Evocative EWR1 4.7 km · 17 MW
- Centersquare New Jersey (EWR5) 4.9 km · 21 MW
- CoreSite - Secaucus (NY2) 5.0 km · 5.8 MW
- InterServer Teb2 5.1 km
- H5 Secaucus 5.2 km
- H5 Data Centers Secaucus (NJ01) 5.3 km
More 365 Data Centers data centers
- 365 Data Centers Bridgewater (BW1) United States
- 365 Data Centers Alpharetta (GA1) United States
- 365 Data Centers Aurora (CO1) United States
- 365 Data Centers Chicago (CH6) United States
- 365 Data Centers Commack (CNY) United States
- 365 Data Centers Detroit (DT1) United States
- 365 Data Centers Ft. Lauderdale (FLL) United States
- 365 Data Centers Herndon (VA1) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.