365 Data Centers Herndon (VA1)
365 Data Centers Herndon (VA1) is an operational data center operated by 365 Data Centers in Herndon, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | 365 Data Centers |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Address | 13873 Park Center Rd |
| Coordinates | 38.93444, -77.42869 |
| Website | atlanticmetro.net/data-centers/virginia-data-center/herndon-va |
Power and grid
| Nearest high-voltage substation | Park Center Substation, 230 kV, 500 m away (Virginia Electric and Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 44 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.2 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is 365 Data Centers Herndon (VA1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Park Center Substation (230 kV), about 500 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for 365 Data Centers Herndon (VA1)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates 365 Data Centers Herndon (VA1)?
365 Data Centers.
Data centers near Herndon
- Data center in Herndon 202 m · 14 MW
- Amazon IAD-500 414 m · 28 MW
- Menlo Digital MD-VA1 903 m · 62 MW
- Amazon IAD-167 1.3 km · 12 MW
- Amazon IAD-135 4.0 km · 21 MW
- Amazon IAD-9 4.4 km · 14 MW
- H5 Data Centers Virginia (4030) 4.7 km · 20 MW
- Amazon IAD-150 4.7 km · 63 MW
More 365 Data Centers data centers
- 365 Data Centers Bridgewater (BW1) United States
- 365 Data Centers Alpharetta (GA1) United States
- 365 Data Centers Aurora (CO1) United States
- 365 Data Centers Carlstadt (NJ3) United States
- 365 Data Centers Chicago (CH6) United States
- 365 Data Centers Commack (CNY) United States
- 365 Data Centers Detroit (DT1) United States
- 365 Data Centers Ft. Lauderdale (FLL) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.