Data Center Directory

Amazon IAD-500

Amazon IAD-500 is an operational data center operated by Amazon Web Services in Herndon, United States. Our footprint estimate of its power is about 28 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power28 MW (range 14 MW to 44 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 22,985 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 12,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAmazon IAD-501
AddressRedskin Drive 13860, 20171, Herndon
Coordinates38.93646, -77.42468

Power and grid

Nearest high-voltage substationPark Center Substation, 230 kV, 300 m away (Virginia Electric and Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km45
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 2.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.2 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon IAD-500 use?

We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.

What chips does Amazon IAD-500 use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon IAD-500 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Park Center Substation (230 kV), about 300 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Amazon IAD-500?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Amazon IAD-500?

Amazon Web Services.

Data centers near Herndon

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.