Data Center Directory

Amazon IAD-135

Amazon IAD-135 is an operational data center operated by Amazon Web Services in Chantilly, United States. Our footprint estimate of its power is about 21 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power21 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,411 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 9,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAmazon IAD-134
AddressVirginia Mallory Drive 3960, 20151, Chantilly
Coordinates38.90484, -77.45475

Power and grid

UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 2.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon IAD-135 use?

We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.

What chips does Amazon IAD-135 use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How clean is the power for Amazon IAD-135?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Amazon IAD-135?

Amazon Web Services.

Data centers near Chantilly

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.