4120 Lafayette Center Drive
4120 Lafayette Center Drive is an operational data center operated by Legacy Investing in Chantilly, United States. Our footprint estimate of its power is about 4.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Legacy Investing |
| Facility power | 4.7 MW (range 2.3 MW to 7.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,896 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 4120 Lafayette Center Drive |
| Coordinates | 38.90594, -77.46902 |
| Website | legacyinvesting.com/portfolio/4120-lafayette-center-dr-chantilly-va |
Power and grid
| Nearest high-voltage substation | Poland Road Substation, 230 kV, 2.3 km away (Virginia Electric and Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 34 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.4 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 4120 Lafayette Center Drive use?
We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.
How close is 4120 Lafayette Center Drive to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poland Road Substation (230 kV), about 2.3 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for 4120 Lafayette Center Drive?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates 4120 Lafayette Center Drive?
Legacy Investing.
Data centers near Chantilly
- H5 Data Centers Virginia (4030) 558 m · 20 MW
- ATI Solutions 593 m · 3 MW
- Amazon IAD-135 1.2 km · 21 MW
- Amazon IAD-150 1.3 km · 63 MW
- Amazon IAD-9 1.5 km · 14 MW
- Data center in South Riding 2.1 km · 13 MW
- Amazon IAD-156 2.2 km · 14 MW
- Amazon IAD-61 2.3 km · 32 MW