Data Center Directory

Data center in South Riding

Data center in South Riding is an operational data center in South Riding, United States. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
Facility power13 MW (range 6.7 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,113 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates38.92061, -77.48374

Power and grid

Nearest high-voltage substationAviator Substation, 230 kV, 400 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km45
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineDominion Transmission Co, interstate pipeline, 4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.0 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in South Riding use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Data center in South Riding to the power grid?

The nearest high-voltage substation in OpenStreetMap is Aviator Substation (230 kV), about 400 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Data center in South Riding?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.