Amazon IAD-167
Amazon IAD-167 is an operational data center operated by Amazon Web Services in Herndon, United States. Our footprint estimate of its power is about 12 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 12 MW (range 5.9 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,774 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Amazon IAD-165 · Amazon IAD-166 · Amazon IAD-168 |
| Address | EDS Drive 13630, 20171, Herndon |
| Coordinates | 38.92271, -77.42630 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 200 m away (Virginia Electric and Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 40 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.2 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon IAD-167 use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
What chips does Amazon IAD-167 use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is Amazon IAD-167 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 200 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Amazon IAD-167?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Amazon IAD-167?
Amazon Web Services.
Data centers near Herndon
- Menlo Digital MD-VA1 540 m · 62 MW
- 365 Data Centers Herndon (VA1) 1.3 km
- Data center in Herndon 1.4 km · 14 MW
- Amazon IAD-500 1.5 km · 28 MW
- Amazon IAD-135 3.2 km · 21 MW
- Amazon IAD-9 3.5 km · 14 MW
- 4120 Lafayette Center Drive 4.1 km · 4.7 MW
- H5 Data Centers Virginia (4030) 4.2 km · 20 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources