Data center in Herndon
Data center in Herndon is a data center under construction in Herndon, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 14 MW (range 7 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,611 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Redskin Drive, 20171, Herndon |
| Coordinates | 38.93540, -77.42670 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Herndon use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Herndon?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Herndon
- 365 Data Centers Herndon (VA1) 202 m
- Amazon IAD-500 211 m · 28 MW
- Menlo Digital MD-VA1 942 m · 62 MW
- Amazon IAD-167 1.4 km · 12 MW
- Amazon IAD-135 4.2 km · 21 MW
- Amazon IAD-9 4.6 km · 14 MW
- H5 Data Centers Virginia (4030) 4.9 km · 20 MW
- Amazon IAD-150 4.9 km · 63 MW
Sources