DataBank Denver (DEN4)
DataBank Denver (DEN4) is an operational data center operated by DataBank in Westminster, United States. Our footprint estimate of its power is about 2.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DataBank |
| Facility power | 2.7 MW (range 1.4 MW to 4.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,283 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | DataBank - DEN4 |
| Address | 7579 W 103rd Ave |
| Coordinates | 39.88455, -105.08013 |
| Website | databank.com/data-centers/denver/den4 |
Power and grid
| Nearest high-voltage substation | Broomfield Substation, 115 kV, 2.6 km away (Public Service Company of Colorado) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Simms Substation, 230 kV, 5.9 km away |
| HV substations within 10 km | 7 |
| Utility | Public Service Co Of Colorado (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 27 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.9 GW in 70 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 485 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.72 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DataBank Denver (DEN4) use?
We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.
How close is DataBank Denver (DEN4) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Broomfield Substation (115 kV), about 2.6 km away. The local utility is Public Service Co Of Colorado, in the PSCO balancing area.
How clean is the power for DataBank Denver (DEN4)?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates DataBank Denver (DEN4)?
DataBank.
Data centers near Westminster
- Google - Thornton 9.3 km · 20 MW
- Sungard AS Thornton 9.6 km
- LSVL-CTC1 9.7 km
- Zayo Networks 11.5 km
- JPMorgan Chase 12.7 km · 29 MW
- CoreSite - Denver (DE3) 14.9 km
- Iron Mountain Data Center - Denver (DEN-1) 15.3 km
- CoreSite - Denver (DE1) 17.0 km · 20 MW
More DataBank data centers
- Databank Orangeburg (LGA3) United States
- DataBank Salt Lake City (SLC2) United States
- DataBank Ashburn (IAD1) United States
- DataBank Dallas (DFW3) United States
- DataBank Las Vegas (LAS1) United States
- DataBank Dallas (DFW4) United States
- DataBank Minneapolis (MSP3) United States
- DataBank Seattle (SEA2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.