ark data centers - Akron,OH
ark data centers - Akron,OH is an operational data center operated by ark data centers in Akron, United States. Our footprint estimate of its power is about 7.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ark data centers |
| Facility power | 7.8 MW (range 3.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,484 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 2 internet exchanges PeeringDB. |
| Also known as | Involta-Akron |
| Address | 191 E. Miller Ave |
| Coordinates | 41.05711, -81.52218 |
| Website | involta.com/data-centers/locations/ohio |
Power and grid
| Utility | Ohio Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 200 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ark data centers - Akron,OH use?
We estimate the facility power at about 7.8 MW. Estimate from building footprint, low confidence.
How clean is the power for ark data centers - Akron,OH?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates ark data centers - Akron,OH?
ark data centers.
Data centers near Akron
- Cogent Akron 3.4 km
- FairlawnGig Service Center 12.3 km
- LightSpeed Hosting - Medina 17.4 km
- SecureData 365 26.1 km
- LSTI 401 Market 31.1 km
- ark data centers - Cleveland, OH 35.0 km · 3.6 MW
- Expedient Cleveland - 151 NEO 41.5 km
- Bluebird Fiber Parma Data Center 44.6 km
More ark data centers data centers
- ark data centers - Cleveland, OH United States
- ark data centers - Duluth, MN United States
- 421 N 6th Ave East United States
- ark data centers - Boise, ID United States
- ark data centers - Cedar Rapids ,IA United States
- ark data centers - Green Bay, WI United States
- ark data centers - Pittsburgh, PA United States
- ark data centers - Tucson, AZ United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.