421 N 6th Ave East
421 N 6th Ave East is an operational data center operated by ark data centers in Duluth, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | ark data centers |
| Networks | 2 networks PeeringDB. |
| Address | 421 N 6th Ave East |
| Coordinates | 46.79574, -92.09601 |
| Website | arkdna.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hilltop 230/115KV Substation, 230 kV, 9.3 km away |
| HV substations within 10 km | 8 |
| Utility | Allete, INC. (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 3.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 169 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 344 g CO₂ per kWh (Minnesota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 25.1%, coal 23%, nuclear 21.5%, gas 20.7%, solar 5.9%. Clean power: 55.8% |
| Industrial power price | USD 0.100 per kWh (Minnesota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 4.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.3 °C (2001 to 2025) |
| Cooling degree days | 126 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.5 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Medium - High (20-40%) (Minnesota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is 421 N 6th Ave East to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 3 km away. The local utility is Allete, INC., in the MISO balancing area.
How clean is the power for 421 N 6th Ave East?
The grid in Minnesota emits about 344 g CO₂ per kWh (2025). Largest sources: wind 25.1%, coal 23%, nuclear 21.5%.
Who operates 421 N 6th Ave East?
ark data centers.
Data centers near Duluth
- Duluth Missabe 1.3 km
- ark data centers - Duluth, MN 4.4 km · 2.7 MW
More ark data centers data centers
- ark data centers - Akron,OH United States
- ark data centers - Cleveland, OH United States
- ark data centers - Duluth, MN United States
- ark data centers - Boise, ID United States
- ark data centers - Cedar Rapids ,IA United States
- ark data centers - Green Bay, WI United States
- ark data centers - Pittsburgh, PA United States
- ark data centers - Tucson, AZ United States