Data center in Middlesex
Data center in Middlesex is an operational data center in Middlesex, United States. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 12 MW (range 5.9 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,829 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.55284, -74.45669 |
Power and grid
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 2.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Middlesex use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Middlesex?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Data centers near Middlesex
- Centersquare New Jersey (EWR3) 190 m
- Digital Realty New York EWR12 213 m · 43 MW
- Open Data Centers Piscataway 277 m
- DataBank Piscataway (EWR2) 421 m · 7.8 MW
- Barclays Datacenter 673 m · 60 MW
- QTS Piscataway Data Center 2.3 km · 96 MW
- Anexio NJ1 2.4 km
- QTS Piscataway (PNJ1) 2.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.