Data center in Carteret is an operational data center in Carteret, United States. Our footprint estimate of its power is about 23 MW.

Key facts

StatusOperational
Facility power23 MW (range 12 MW to 37 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 19,319 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressFederal Boulevard 1400, 07008, Carteret
Coordinates40.58437, -74.24338

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 900 m away (Public Service Enterprise Group)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km21
UtilityPublic Service Elec & Gas Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 300 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km18 GW in 166 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.3 °C (2001 to 2025)
Cooling degree days481 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.01 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Carteret use?

We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.

How close is Data center in Carteret to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 900 m away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.

How clean is the power for Data center in Carteret?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.