Telehouse Teleport

Telehouse Teleport is an operational data center operated by Telehouse in New York City, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorTelehouse
Facility power11 MW (range 5.5 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,176 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressTeleport Drive 7, 10314, New York City
Coordinates40.60704, -74.17490

Power and grid

Nearest high-voltage substationGoethals Substation, 345 kV, 2.1 km away (Consolidated Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km18
UtilityConsolidated Edison Co-Ny INC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityNYIS
Nearest gas pipelineBrooklyn Union Gas Co, intrastate pipeline, 100 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km18 GW in 160 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity268 g CO₂ per kWh (New York, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9%
Industrial power priceUSD 0.105 per kWh (New York, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.3 °C (2001 to 2025)
Cooling degree days481 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.01 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow - Medium (10-20%) (New York)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Telehouse Teleport use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Telehouse Teleport to the power grid?

The nearest high-voltage substation in OpenStreetMap is Goethals Substation (345 kV), about 2.1 km away. The local utility is Consolidated Edison Co-Ny INC, in the NYIS balancing area.

How clean is the power for Telehouse Teleport?

The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.

Who operates Telehouse Teleport?

Telehouse.

Data centers near New York City

More Telehouse data centers

Sources

Correct this page or get the data