Telehouse Teleport
Telehouse Teleport is an operational data center operated by Telehouse in New York City, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telehouse |
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,176 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Teleport Drive 7, 10314, New York City |
| Coordinates | 40.60704, -74.17490 |
Power and grid
| Nearest high-voltage substation | Goethals Substation, 345 kV, 2.1 km away (Consolidated Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 18 |
| Utility | Consolidated Edison Co-Ny INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | NYIS |
| Nearest gas pipeline | Brooklyn Union Gas Co, intrastate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 18 GW in 160 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.3 °C (2001 to 2025) |
| Cooling degree days | 481 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.01 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telehouse Teleport use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Telehouse Teleport to the power grid?
The nearest high-voltage substation in OpenStreetMap is Goethals Substation (345 kV), about 2.1 km away. The local utility is Consolidated Edison Co-Ny INC, in the NYIS balancing area.
How clean is the power for Telehouse Teleport?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates Telehouse Teleport?
Telehouse.
Data centers near New York City
- Telehouse - Teleport Center (New York) 134 m
- Merrill Lynch Data Center 152 m · 8.5 MW
- Metanet New York Data Center Staten Island 664 m
- Data center in Carteret 6.3 km · 23 MW
- Barclays Datacenter 10.2 km · 14 MW
- Equinix NY1 - New York, Newark 14.4 km · 12 MW
- Wnet Telecom USA 15.2 km
- Dataverge 15.4 km
More Telehouse data centers
- Telehouse North United Kingdom
- Telehouse data center in Frankfurt am Main Germany
- Telehouse 3 France