Telehouse North is an operational data center operated by Telehouse in London, United Kingdom. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telehouse |
| Facility power | 31 MW (range 15 MW to 49 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,279 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Telehouse North Two · Telehouse West · Telehouse East |
| Address | Coriander Avenue, E14 2AA, London |
| Opened | 1990 |
| Coordinates | 51.51205, -0.00195 |
| Website | telehouse.net/data-centre-services/uk/london/telehouse-north-two |
Power and grid
| Nearest high-voltage substation | Telehouse Substation, 132 kV, 100 m away (Telehouse) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | West Ham Substation, 400 kV, 900 m away |
| HV substations within 10 km | 52 |
| Power plants within 50 km | 3.1 GW in 98 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telehouse North use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
How close is Telehouse North to the power grid?
The nearest high-voltage substation in OpenStreetMap is Telehouse Substation (132 kV), about 100 m away.
How clean is the power for Telehouse North?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Telehouse North?
Telehouse.
Data centers near London
- Global Switch London East 159 m · 38 MW
- IP House Data Centre 477 m · 3.6 MW
- Telehouse - London (Docklands South) 566 m · 37 MW
- Global Switch London North 606 m
- Netwise London East (NLE) 948 m
- Cable & Wireless Data Centre 1.2 km · 1.3 MW
- EXA Datacenter London (Citi) 1.4 km
- Digital Realty London LHR20 1.5 km · 1.5 MW
More Telehouse data centers
- Telehouse data center in Frankfurt am Main Germany
- Telehouse Teleport United States
- Telehouse 3 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.