Data Center Directory

Cable & Wireless Data Centre

Cable & Wireless Data Centre is an operational data center operated by Cable & Wireless in Canary Wharf, United Kingdom. Our footprint estimate of its power is about 1.3 MW.

Key facts

StatusOperational
OperatorCable & Wireless
Facility power1.3 MW (range 0.7 MW to 2.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 557 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 560 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.50201, -0.00912

Power and grid

Nearest high-voltage substationBlackwall Way Substation, 132 kV, 700 m away (UK Power Networks)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWest Ham Substation, 400 kV, 2.1 km away
HV substations within 10 km54
Power plants within 50 km3.1 GW in 97 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34 °C (2001 to 2025)
Cooling degree days46 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cable & Wireless Data Centre use?

We estimate the facility power at about 1.3 MW. Estimate from building footprint, low confidence.

How close is Cable & Wireless Data Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is Blackwall Way Substation (132 kV), about 700 m away.

How clean is the power for Cable & Wireless Data Centre?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Cable & Wireless Data Centre?

Cable & Wireless.

Data centers near Canary Wharf

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.